Where a development requires a connection to the surface water sewer network there is a requirement to undertake a DIA. The purpose of the DIA is to establish whether the effect on the receiving network either presents no significant additional risk or presents a risk that can be effectively and realistically mitigated. Anglian Water will raise an objection in planning to any development proposing a connection for surface water when the impact on the sewer network has not been evaluated.